Checklist for Bored cast in-situ piles Boring
Checklist for Bored cast in-situ piles Boring
Checklist for Bored cast in-situ piles Boring


Piles can either be driven into the ground (driven piles) or be installed in a predrilled hole (bored piles or drilled shafts). The construction of bore cast in situ concrete pile consists of 4 primary phases

1.Pile boring,
2.Reinforcement cage lowering,
3.Flushing
4.Pile concreting.

Post a Comment

Previous Post Next Post