Checklist for Bored cast in-situ piles Boring |
Piles can either be driven into the ground (driven piles) or be installed in a predrilled hole (bored piles or drilled shafts). The construction of bore cast in situ concrete pile consists of 4 primary phases
1.Pile boring,
2.Reinforcement cage lowering,
3.Flushing
4.Pile concreting.
1.Pile boring,
2.Reinforcement cage lowering,
3.Flushing
4.Pile concreting.